Organizer

Co-organizer

Supporter

  • 发泰(天津)科技有限公司
  • 东富龙
  • 奥星
  • Chargepoint 技术公司
  • 维萨拉
  • 西门子
  • 上海净泽洁净设备有限公司
  • 迈康
  • 科百特
  • 新莱
  • 福禄克公司
  • 三盛
  • Burkert
  • 阿美特克有限公司
  • 威泽尔
current position:special project>>Vogel International Pharmaceutical Engineering Forum 2012

当前位置: 弗戈制药网 >> 新闻 >> 热点活动

>>冯力,上海生物制品研究所有限责任公司,工程部副经理

冯力,上海生物制品研究所有限责任公司,工程部副经理

作者: 文章来源:  点击数:2128  发布时间:2012-05-21

Work state

Be responsible for Engineering project management, GEP system operation and management.

Foreign-funded enterprises work experience more than 10 years, has served on the engineering project, production and Facility department

Good experience in operation and management

Work Experience

Jun.2009—Present: Shanghai Institute of Biological Products Co.,Ltd.

Engineering Dept. Deputy manager Senior Engineer

Apr.2011—Present:Be responsible for Engineering project management & GEP system operation and management

Feb.2010—Apr.2011: Be involved in preparation of setting up of SIBP Fengxian Exploitation project

Jul 2009—Feb.2010: Tehnology support for production workshop renovation project.

Jul.2007 - Oct.2008 Jabil circuit (Shanghai) Co., Ltd

Mechanical engineering /Facility Supervisor /senior engineer

* Be responsible for project management of manufacturing expansion, including invite tendering, project budget, safety training to contractor, EHS&site&layout management, etc

* Be responsible for building/Facility transformation project, including the production workshop renovation and layout.

* Be responsible for the maintenance & management of the facility and equipments,including the installation and adjustment of facilities, maintenance plan & budget, supervise the contractors, operation training, optimize work flow and facility efficiency.

Feb.1995 – May.2007 Corning (Shanghai) Fiber Optics Co., Ltd.

(former Lucent Technologies Shanghai Fiber Optics Co., Ltd.)

Facility support & engineering technology Supervisor

* Joined former AT&T in Feb.1995.

Be involved in preparation of setting up of pl ant as well as operation and management after going into production, main activities:

* operation of HVAC system, gas and facilities; organizing the repairing and

maintaining of building and equipments, establish the facilities costs budgete, maintenance plan and improvement

project schedule

* Be responsible for the engineering project management and invite tendering

* Internal auditor of ISO9002/TL9000 & ISO14001/OHSAS18001

-Jul.1983---Feb.1995 Shanghai Institute of Biological Products Ministry of Public Health

Engineer of instrument equipment / facility

* import, installation and adjustment of instrument equipment/facility

* Be involved in development and localization of production equipments, assisting the industrialization of scientific project

Education

1979/09--1983/07Shanghai Jiao Tong University Precision Instrument department Bachelor of science

Training

1996/06--2005/12following as

Training

* Dec.2005, Corning DEMAC improve on quality analyse system training

* May 2001, Polarisation Mode Dispersion measurement of UK PerkinElmer Optoelectronics in UK

* Jun.1996 , PK2200/PK2400 measurement and maintenance in USA Photon Kinetics/York, Calibration and equipment management in USA Lucent AK,CD300 Chromatic Dispersion measurement and maintenance in UK EG&G

* Mar.2000, Project Management by Shanghai JET

Certifications

2005/03safety officer licence

2000/12TL9000 Internal Auditor training course by KIND Management Consulting INC. Auditor Certificate obtained

2000/06OHSAS18001 Internal Auditor training course by DNV, Auditor Certificate obtained

1999/09ISO14001 Internal Auditor training course by Shanghai Center for Environmental Management System, Auditor Certificate obtained

1999/05ISO9001 Internal Auditor training course by Shanghai Quality Control Education & Training Center, Auditor Certificate obtained

关闭
联系方式、在线报名